Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\wwwroot\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the industrium domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\wwwroot\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the industrium domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\wwwroot\wp-includes\functions.php on line 6114
The World-Class Kamoa-Kakula Copper Complex Partners with Elessent Clean Technologies for MECS® Sulfuric Acid Plant – Elessent Clean Technologies
Contact Us

The World-Class Kamoa-Kakula Copper Complex Partners with Elessent Clean Technologies for MECS® Sulfuric Acid Plant

The World-Class Kamoa-Kakula Copper Complex Partners with Elessent Clean Technologies for MECS® Sulfuric Acid Plant

a
MicrosoftTeams-image

The World-Class Kamoa-Kakula Copper Complex Partners with Elessent Clean Technologies for MECS® Sulfuric Acid Plant

The Kamoa-Kakula Copper Complex (Kamoa-Kakula), a joint venture between Ivanhoe Mines, Zijin Mining Group and the government of the Democratic Republic of Congo (DRC), has partnered with Elessent Clean Technologies (Elessent) to install a new 2,500 metric tonne per day (MTPD) smelter off-gas MECS® sulfuric acid plant. In conjunction with global EPC partner, China Nerin Engineering Co. Ltd. (NERIN), the new acid plant will be part of a new 500,000-tonnes-per-annum direct-toblister flash copper smelter that is under construction at Kamoa-Kakula, as part of its Phase 3 expansion. Upon completion of the Phase 3 expansion, Kamoa Kakula is projected to be the fourth largest copper operation globally

Download