Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\wwwroot\wp-includes\functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the industrium domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\wwwroot\wp-includes\functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the industrium domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\wwwroot\wp-includes\functions.php on line 6114 January 2024 – Elessent Clean Technologies
Essar Oil UK Limited (Essar) has selected Belco Technologies Corporation (BELCO), a subsidiary of Elessent Clean Technologies (Elessent), to provide a gas cleaning system as part of the EET Industrial Carbon Capture Plant at the Stanlow refinery. This partnership marks a…
The Kamoa-Kakula Copper Complex (Kamoa-Kakula), a joint venture between Ivanhoe Mines, Zijin Mining Group and the government of the Democratic Republic of Congo (DRC), has partnered with Elessent Clean Technologies (Elessent) to install a new 2,500 metric tonne per day (MTPD)…